The Ontario Building Code | General Requirements
8.6.1.2. General Requirements
(1) The treatment unit shall be connected to a leaching bed constructed in accordance with the requirements of Section 8.7.
In Plain Language
This article sets the general requirements for the dosing or pumping system covered in this Section, forming the baseline that the following, more specific articles build on.
This is a plain-language summary of the 2012/2017 Ontario Building Code text above, for general understanding only and not a substitute for the Code. Always confirm current requirements against the 2024 edition (O.Reg. 163/24) or a qualified professional before construction.