The British Columbia Building Code | Section 1.2. | Terms and Abbreviations Pt 2

Division C: Administrative Provisions Part 1 – General
British Columbia Building Code 2018 Division C
Section 1.2. Terms and Abbreviations
1.2.1. Definitions of Words and Phrases
1.2.1.1. Non-defined Terms
1) Words and phrases used in Division C that are not included in the list of definitions in Article 1.4.1.2.of
Division A shall have the meanings that are commonly assigned to them in the context in which they are used, taking
into account the specialized use of terms by the various trades and professions to which the terminology applies.
2) Where objectives and functional statements are referred to in Division C, they shall be the objectives and
functional statements described in Parts 2 and 3 of Division A.
3) Where acceptable solutions are referred to in Division C, they shall be the provisions stated in Parts 3 to 10 of
Division B.
4) Where alternative solutions are referred to in Division C, they shall be the alternative solutions mentioned in
Clause 1.2.1.1.(1)(b)of Division A.
1.2.1.2. Defined Terms
1) The words and terms in italics in Division C shall have the meanings assigned to them in Article 1.4.1.2.of
Division A.
1.2.2. Symbols and Other Abbreviations
1.2.2.1. Symbols and Other Abbreviations
1) The symbols and other abbreviations in Division C shall have the meanings assigned to them in
Article 1.4.2.1.of Division A.
Division C: Administrative Provisions Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Division C: Administrative Provisions Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Division C: Administrative Provisions Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Division C: Administrative Provisions Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Notes to Part 2
Administrative Provisions
A-2.2.1.2.(1) Structural Design. Part 4 of Division B is written on the assumption that structural design will be carried out
by a registered professional who is qualified to perform such design. Sentence2.2.1.2.(1) is not intended to imply that a registered
professional may not also be required in the application of requirements in other Parts of the British Columbia Building Code.
A-2.2.6.2.(1) Information Required on Drawings and Specifications. Examples of information that should be shown
on architectural drawings and drawings for heating, ventilating and air-conditioning systems are:
(a) the name, type and location of the building,
(b) the name of the owner,
(c) the name of the architect,
(d) the name of the engineer or designer,
(e) the north point,
(f) the dimensions and height of all rooms,
(g) the intended use of all rooms,
(h) the details or description of the wall, roof, ceiling and floor construction, including insulation,
(i) the details or description of the windows and outside doors, including the size, weatherstripping, storm sashes, sills and
storm doors,
(j) the size and continuity of all pipes, ducts, shafts, flues and fire dampers,
(k) the location, size, capacity and type of all principal units of equipment,
(l) the size, shape and height of all chimneys and gas vents,
(m) the size and location of all combustion air and ventilation openings, and
(n) the location and fire-resistance rating of required fire separations.
A-2.2.7. Professional Design and Review. This Subsection provides for the use of what are generally called Letters of
Assurance. The letters themselves, known as Schedules A, B, C-A and C-B and located at the end of Division C, are intended to put on
paper the responsibilities of the owner and the various registered professionals in a construction project. The Letters of Assurance do
not impose any additional responsibilities on the registered professionals nor are they intended to alter the roles and responsibilities of
the authorities having jurisdiction.
The Schedules have been very carefully scrutinized by the Province of British Columbia, Union of BC Municipalities, Building
Officials’ Association of British Columbia, Architectural Institute of British Columbia, Association of Professional Engineers and
Geoscientists of British Columbia and their respective legal counsel. The precise wording in the letters is extremely critical and must
not be modified. Any notations on these Schedules which are absolutely necessary to suit a particular project must be clearly and
legibly marked in ink on the copies.
It is typical that the registered professional responsible for the design is also responsible for the field review. There are instances where
this is not the case and having a different registered professional doing the field reviews is unavoidable. Schedule C-B requires that the
registered professional who provides the field review provide assurance that the building as finally constructed is in substantial
conformance with the Code. In the event that another registered professional is to provide field review, the field reviewer takes on the
responsibility to confirm that the construction substantially complies with the plans and supporting documents that were submitted
for the building permit. The responsibility for code compliance of the design remains with the original registered professional who
undertook the design. In this event, the Schedule C-B must be modified by the field reviewer by crossing out and initialing
Clause (b)(i) and providing the effective transition date.
Note that Schedules A, B, C-A & C-B, as required by Subsection 2.2.7., must be signed, sealed and submitted to the authority having
jurisdiction, as applicable for each specific project. Conditional or qualified Schedules are not typically acceptable. Any fire and life
safety issue relative to the Schedule B disciplines is to be remedied before the Schedules C-A / C-B are released, not accommodated by
conditions or qualifications placed on the Schedule or by any attached document. See the Guide to Letters of Assurance, available
from the Building and Safety Standards Branch Web site, for more details.
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
A-2.2.7.1.(1)(c)(i) Structural Components. The reference to “structural components of buildings that fall within the scope
of Part 4” includes the situation where a building is classified under Part 9 due to its size and occupancy but also contains some
structural components (such as beams supporting concentrated loads) which must be designed under Part 4. In this situation only
Schedules B and C-B for the structural components are required. Schedule A and Schedules B, C-A and C-B relating to non-structural
components are not required.
A-2.2.7.2.(1)(a) Coordinating Registered Professional. The coordinating registered professional is responsible to
ascertain that all Code related aspects which are relevant to the project are clearly identified by each of the registered professionals in
the collection of Schedules B. If a registered professional of record has crossed out any item on their Schedule B, the coordinating
registered professional must confirm this item is not applicable to the project or resolve the issue with the registered professional
of record.
A-2.2.7.2.(1)(b) Schedule B. The purpose of Schedule B is to clearly identify the appropriate registered professional of record
who has the overall responsibility in each discipline for compliance with the various Code related aspects of the project. Detailed
design of certain building components may be undertaken by other registered professionals. The registered professional of record is
responsible for monitoring the design work and field review of the other registered professionals within their discipline for components
listed in Schedule B. In the event that the other registered professionals provide design and field review, the registered professional of
record must be satisfied that such design and field reviews have been performed and is responsible for Schedule C-B.
A-2.2.7.2.(2) Schedule C-A. Schedule C-A provides confirmation that the coordinating registered professional has completed
the obligation to coordinate the various registered professionals engaged in the project. It also confirms that the testing of the
interrelated fire and life safety systems, such as fire alarms and sprinklers, has been completed and the systems function as intended.
A-2.2.7.3. Demonstration of the Coordinated Fire and Life Safety Systems. The design drawings and supporting
documents must clearly indicate all essential details of the Coordinated Fire and Life Safety Systems prior to the construction of or the
alteration to a building. Demonstration of the proper, integrated operation of the Fire and Life Safety Systems must be conducted
prior to occupancy.
Note that Schedules A, B, C-A & C-B, as required by Subsection 2.2.7., must be signed and sealed and submitted to the authority
having jurisdiction, as appropriate for each specific project.
The following is an example of the steps required to coordinate the installation and testing of fire and life safety systems in buildings.
1.0. General
Referencing Schedule B:
Item No. 1.14 "Functional Testing of Architecturally Related Fire Emergency Systems and Devices,"
Item No. 3.4 "Functional Testing of Mechanically Related Fire Emergency Systems and Devices,"
Item No. 4.5 "Functional Testing of Plumbing Related Fire Emergency Systems and Devices,"
Item No. 5.14 "Functional Testing of Fire Suppression Systems and Devices," and
Item No. 6.3 "Functional Testing of Electrical Related Fire Emergency Systems and Devices."
The Coordinating Registered Professional (CRP) and Registered Professionals of Record (RPRs) must demonstrate that the Fire and
Life Safety Systems' design has been coordinated prior to the issuance of the Building Permit. That is, the CRP/RPRs must
accumulate and submit the necessary documentation, such as:
complete drawings,
schedules,
schematic diagrams,
a fire alarm system sequencing description showing coordination between mechanical and electrical fire protection and life safety
systems,
mechanical fire protection and life safety schematic riser diagrams,
an electrical fire alarm riser diagram,
a motor data list coordinated with fire alarm system sequencing, and
other documentation, as appropriate,
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
to demonstrate that the interface of the Fire and Life Safety Systems has been designed and coordinated so that when built correctly
they will function as an integrated system. Further, it is intended that when the construction of the Fire & Life Safety Systems is
indicated by the Contractor to be complete, the RPRs/CRP witness the demonstration of the testing of the Fire and Life Safety
Systems to confirm compliance that the as-built systems function as intended by the design.
The required list of items will depend on the simplicity or complexity of the Project. The following is a comprehensive list of items for
Fire and Life Safety Systems for a complex project, which must be coordinated in order to demonstrate compliance:
Notes: It is the responsibility of the Coordinating Registered Professional (CRP) and Registered Professionals of Record (RPRs) to determine
the best method of "How To" demonstrate to the Authority Having Jurisdiction (AHJ) that the Fire and Life Safety Systems have been
coordinated for each project. That is, the method(s) used (i.e., charts, drawings, matrices, tables, etc.) for demonstration purposes should be
project-specific and relate only to that project.
It is not the intent of this Appendix material to dictate or produce "checklists" or other prescriptive methods for demonstrating
compliance since this is best left to the professional discretion of the appropriate CRP/RPRs.
2.0. Design Phase — Building Permit Application Stage & Final Construction Phase — Occupancy Permit
Application Stage
2.1. Fire Protection and Life Safety Systems
2.1.1. Automatic Sprinkler Systems
design requirements to appropriate Standard
2.1.2. Standpipe Systems
design requirements to appropriate Standard
Class I/Class II
locations
•coverage
F.D. connections
2.1.3. Fire Pump Systems
design requirements to appropriate Standard
2.1.4. Fire Alarm Systems
one/two stage system(s)
no. of systems
design requirements to appropriate Standard
sequence of operation
F.A. system zoning
location of F.A. system devices
annunciator panel (location and design criteria)
annunciator panel shop drawings (detail design)
sprinkler zone/waterflow device
smoke detectors
smoke alarms
manual pull stations
signals to Fire Department via an acceptable central monitoring station
activation of ancillary devices
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
2.1.6. Emergency Telephone System
each exit stair
2.1.7. Emergency Power
design requirements to appropriate Standard
supervisory provisions for fire alarm
emergency electrical load
emergency generator
2.1.8. Emergency Lighting
•exits
access to exits
public corridors
other floor areas
2.1.9. Exit Signs
2.2. Additional Requirements for High Buildings
2.2.1. Interface Condition between Highrise and Lowrise Components (Measure 'N' Vestibules)
2.2.2. Smoke Control — Measure A
design requirements to appropriate Standard
venting above-grade stairs
separation of above-grade and below-grade stairs
venting below-grade stairs
pressurization of below-grade stairs at bottom
above-grade elevator shaft serving below-grade protected with a "protected" vestibule
additional controls at CACF (annunciator panel shop drawings)
2.2.3. Smoke Venting
2.2.4. Fire Fighters' Elevators
fire fighting controls
emergency recall
2.2.5. Protection of Emergency Electrical Conductors
highrise elevator
emergency generator(s)
•fire pump(s)
smoke control systems
smoke venting systems
fire alarm and emergency voice communication systems
2.2.6. Emergency Voice Communications
integrated with F.A. system
audible to appropriate Standard
zoning of speakers
3.0. Roles and Responsibilities for the Demonstration of the Coordinated Fire and Life Safety Systems
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
3.1. Roles and Responsibilities for the Design, Commissioning and Functional Testing of Fire and Life Safety
Systems
3.1.1. Design Phase
RPRs will clearly indicate on their drawings and supporting documents the details of the fire and life safety systems for each applicable
item of Section 2 for their particular discipline. RPRs will also coordinate the design of the components in their system with the
designs of other RPRs on the project. RPRs are to indicate what functional testing, system verification, etc., must be performed by the
Contractor or subtrades and establish the documentation to be provided.
The CRP will develop the project-specific test protocol and procedures in consultation with the RPRs. The CRP will act as the
facilitator for the coordination of the design of the fire and life safety systems among the various RPRs.
3.1.2. Construction Phase
The Contractor will coordinate the activities of the subtrade contractors for the installation of the fire and life safety systems in
accordance with the contract documents.
RPRs will provide field reviews to ascertain that the construction of the fire and life safety systems substantially complies with their
design.
RPRs will review shop drawings of the fire and life safety systems to determine that they accurately reflect their design intent. They will
also coordinate their reviews with those of the other RPRs on the project.
The CRP will coordinate the shop drawing reviews and field reviews by the RPs with the objective that the entire fire and life safety
system will correctly operate as an integrated system.
3.1.3. Occupancy Phase
The Contractor will coordinate the subtrade contractors for the commissioning and functional testing of the fire and life safety
systems. The Contractor will also collect all of the required Occupancy Permit submission documents from the various subtrade
contractors and forward them to the CRP.
The CRP will take the lead role in coordinating the activities of the RPRs required for the commissioning and functional testing of the
fire and life safety systems. The CRP will distribute the test protocol and test procedures, as developed in the Design Stage, to the
various parties involved in the process.
RPRs will ascertain that the appropriate commissioning and functional testing of the fire and life safety systems of the components in
their disciplines have been satisfactorily completed by the subtrade contractors. They will also determine that the appropriate
Occupancy Permit submission documents have been submitted and filled in correctly.
The CRP will be responsible for collecting all of the required Occupancy Permit submission documents, reviewing them for
completeness and accuracy, and forwarding them to the AHJ in a complete package at least 24 hours prior to the Coordinated Final
AHJ Review.
3.2. Sample Summary of Roles and Responsibilities for Demonstration of the Coordinated Fire and Life
Safety Systems
The following is a sample summary (only) of the roles and responsibilities for a typical highrise building with underground parking.
The precise roles and responsibilities for each project will vary depending on the complexity. The CRP will ascertain that the
appropriate roles and responsibilities for each project are fulfilled by the RPRs.
3.2.1. Coordinating Registered Professional
Design Phase
Determine the appropriate RPRs required for the project and make arrangements with the owner for their services.
Clarify the roles and responsibilities of the various RPRs.
Coordinate the design of the fire and life safety systems by the RPRs.
Coordinate and develop the test protocol and procedures for functional testing of the fire and life safety systems.
Coordinate the submission of the design drawings and supporting documents for the Building Permit application.
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Construction Phase
Coordinate and monitor the field reviews of the RPRs.
Coordinate and monitor the review of shop drawings by the RPRs.
Facilitate the information flow among the RPRs and Contractor.
Occupancy Phase
In conjunction with the RPRs, finalize the project-specific test protocol and procedures for the fire and life safety systems, and
review the requirements with the Contractor, subtrades and RPRs.
Finalize the list of project-specific occupancy permit submission documents and the schedule for submissions and confirm
completeness with AHJ.
Organize the "Coordinated Final Consultant Review" at least one week prior to "Coordinated AHJ Final Review."
Take a lead role in coordinating the functional testing of the fire and life safety systems during the "Coordinated Final Consultant
Review."
Coordinate the RPRs' review of Occupancy Permit submission documents for completeness and accuracy.
Coordinate Certification of Equivalencies, if applicable.
Collect all of the required Occupancy Permit submission documents and submit them in a complete package to the AHJ.
Organize the "Coordinated AHJ Final Review."
Record any deficiencies identified at the "Coordinated AHJ Final Review" and monitor RPRs' field review of the corrective actions
by the subtrades.
Assist in finalizing the list of outstanding requirements which need to be met for the issuance of the Occupancy Permit.
Follow-up on minor deficiencies post-Occupancy.
3.2.2. Architectural Design Phase
Establish the conceptual design for the fire and life safety systems in consultation with RPRs.
Determine equivalency reports required and coordinate the implementation on the drawings and supporting documents.
Clearly indicate on drawings and supporting documents:
Major occupancies and code classifications.
Fire separations and fire-resistance ratings.
Closures:
Fire-protection rating
Temperature rise requirements
Amount of glazing
Hardware for closures
Panic hardware
Hold-open devices
Electromagnetic locks
Egress systems.
Provisions for fire fighting access.
Interior and exterior finishes.
Elevating devices c/w integrated controls to the fire alarm panel.
Signage coordinated with fire alarm system and annunciation.
Construction Phase
Provide field reviews of architectural components.
Review shop drawings for architectural components and coordinate requirements with other RPRs.
Review shop drawings for other disciplines which may influence architectural components.
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Occupancy Phase
Ascertain that the architectural components substantially conform to the architectural drawings and supporting documents.
Perform an active role in witnessing the functional testing of the architectural components of the fire and life safety systems.
Coordinate the signage with the fire alarm annunciator and the fire safety plans.
Review the architecturally-related Occupancy Permit submission documents provided by the Contractor and subtrades for
completeness and accuracy.
Prepare and forward to the CRP the architectural Schedule C-B and other assurance letters required for the Occupancy Permit.
3.2.3. Mechanical/Plumbing Design Phase
Coordinate mechanical/plumbing clearances and functional requirements with other RPRs.
Clearly indicate on drawings and supporting documents:
Details of the mechanical/plumbing components of the fire and life safety systems.
Schematic diagram of the smoke venting system showing all fans, ducts, motorized dampers, fusible link dampers and
backdraft dampers.
Location and fire-protection ratings of fusible link fire dampers and fire stop flaps.
Location and fire-protection ratings of motorized fire dampers.
Location and fire-resistance ratings of fire-rated duct enclosures.
Fire stop systems for mechanical/plumbing penetrations of fire separations.
Kitchen exhaust system/suppression system.
Mechanical fans/motorized dampers sequence of operations:
Describe operation under normal mode
Describe operation under fire alarm mode
Indicate fire alarm initiation devices that activate change of operation
Construction Phase
Provide field reviews of mechanical/plumbing components.
Review shop drawings for mechanical/plumbing components and coordinate requirements with other RPRs.
Review shop drawings for other disciplines which may influence mechanical/plumbing components.
Occupancy Phase
Ascertain that the mechanical/plumbing components substantially conform to the mechanical/plumbing drawings and supporting
documents.
Perform an active role in witnessing the functional testing of the mechanical/ plumbing components of the fire and life safety
systems.
Review the mechanical/plumbing related occupancy permit submission documents provided by the Contractor and subtrades for
completeness and accuracy.
Prepare and forward to the CRP the mechanical/plumbing Schedule C-B and other assurance letters and documentation required
for the Occupancy Permit.
3.2.4. Fire Suppression
The design of sprinkler systems can be accomplished by at least two possible scenarios:
Scenario 1
The engineer of record undertakes the complete detailed design prior to the building permit application.
The engineer of record submits Schedule B with the BP application.
The engineer of record provides field reviews during construction and submits a Schedule C-B prior to Occupancy Permit.
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
Scenario 2
The engineer of record provides a detailed performance specification for the sprinkler design, as well as sufficient drawings to
demonstrate/assure layout feasibility and interface with other components.
The engineer of record submits Schedule B with the BP application for overall coordination of the sprinkler design. Schedule B can
be annotated "For Performance Specification Only."
The performance specifications may include a requirement that a separate sprinkler design engineer be responsible for detailed
sprinkler design, preparation of sprinkler shop drawings and hydraulic calculations, letter of assurance Schedule B, (for field review
during construction), and Schedule C-B (for Detailed Design) prior to Occupancy Permit.
The engineer of record reviews the detailed sprinkler design and shop drawings to ascertain that they substantially comply with the
performance specifications.
The engineer of record provides a Schedule C-B prior to Occupancy Permit to confirm overall coordination of the sprinkler design
and installation. Schedule C-B can be annotated "For Performance Specification Only." The engineer of record is entitled to rely
upon the professional seal of the sprinkler design engineer for the detailed design and field review of the sprinkler system.
For purposes of this example, Scenario 2 Roles and Responsibilities are outlined below:
Design Phase by Engineer of Record
Coordinate fire suppression spatial and functional requirements with other RPRs/CRP.
Clearly indicate on the drawings and performance specification:
Fundamental design parameters for the fire suppression system to appropriate Standard.
Location of fire department siamese hose connections.
Location and size of standpipes and hose connections.
Details of special sprinkler protection as per equivalent reports.
Fire stop systems for pipe penetrations of fire separations.
Zoning of the sprinkler system to be coordinated with the electrical engineer for the fire alarm annunciation and clearly
identified in the performance specifications.
Construction Phase by Sprinkler Design Engineer
Prepare, sign and seal shop drawings and hydraulic calculations, clearly indicating:
Details of the fire suppression components of the fire and life safety systems.
Schematic riser diagram of sprinkler and standpipe systems c/w all devices that will be connected to the fire alarm system (flow
switches, tamper switches, pressure switches, freeze monitoring, heat trace monitoring).
Location of fire department siamese hose connections.
Location and size of standpipes and hose connections.
Details of special sprinkler protection as per equivalent reports.
Zoning of the sprinkler system to be coordinated with the electrical engineer for the fire alarm annunciation and clearly
identified on the sprinkler shop drawings.
Coordinate fire suppression location and functional requirements with engineer of record/CRP.
Provide field reviews of fire suppression components.
Construction Phase by Engineer of Record
Review shop drawings and hydraulic calculations for fire suppression components to determine substantial conformance to the
performance specifications.
Provide field reviews of fire suppression components to determine substantial conformance to the performance specifications.
Monitor the field reviews by the Sprinkler Design Engineer to determine substantial conformance with the performance
specifications.
Review shop drawings for other disciplines which may influence fire suppression components.
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
Occupancy Phase by the Engineer of Record
Ascertain that the fire suppression components substantially conform to the performance specifications.
Perform an active role in witnessing the functional testing of the fire suppression components of the fire and life safety systems.
Review the fire suppression-related Occupancy Permit submission documents by the Contractor and subtrades for completeness
and accuracy.
Collect the Schedule C-B from the Sprinkler Design Engineer, review for accuracy and completeness and forward to the CRP.
Collect other Occupancy Permit documents from the subtrade contractor (e.g., Contractor's Material and Test Certificates), review
for completeness and forward to the CRP.
Prepare and forward to the CRP the fire suppression Schedule C-B for overall coordination of the fire suppression system.
Occupancy Phase by the Sprinkler Design Engineer
Ascertain that the fire suppression components substantially conform to the sprinkler shop drawings and supporting documents.
Perform an active role in witnessing the functional testing of the fire suppression components of the fire and life safety systems.
Review the fire suppression-related Occupancy Permit submission documents by the Contractor and subtrades for completeness
and accuracy.
Prepare and forward to the Engineer of Record the fire suppression Schedule C-B and other assurance letters and documentation
required for the Occupancy Permit.
3.2.5. Electrical
Design Phase
Coordinate with the CRP and RPRs the test protocol and procedures for functional testing of the fire and life safety systems.
Details of the electrical components of the fire and life safety systems.
Clearly indicate on drawings and supporting documents:
Fire Alarm System
Location of fire alarm annunciator panel and central alarm control facility
Location of fire alarm initiating devices (smoke detectors, heat detectors, manual pull stations)
Fire alarm riser diagram c/w ancillary device connections
Audibility of fire alarm signal throughout floor area
Zoning of fire alarm initiation devices and audible signal appliances
Monitoring of fire alarm
Routing and method of protection of emergency conductors
Wiring methods for equipment
Testing/verification requirements and the documentation to be submitted to the RPR
Sprinkler System
Coordinate design with sprinkler design engineer
Sprinkler system alarm initiation and monitoring to be indicated on the fire alarm riser diagram (flow, tamper,
pressure, etc.)
Detailed diagrams for freeze protection systems (heat trace monitoring, low temperature monitoring, etc.)
Fire Pump Systems
Riser diagram to indicate monitoring of the fire pump (pump running, power failure, phase reversal, wiring details for
device connections)
Routing and method for protection of fire pump feeders from fire and power source, so that a fire from one source will not
interrupt power from the other source
Electrical requirements to appropriate Standard and documents to be submitted to RPR (overcurrent protection details,
location of controller and transfer switches, voltage drop, etc.)
Kitchen Exhaust/Fire Suppression System
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
•Emergency Generator
Generator load calculations
Details and wiring diagram for monitoring through the fire alarm system
Details for testing to appropriate Standard and documents to be submitted to RPR
•Smoke Venting Systems
Coordinate design with the mechanical engineer
Fire alarm riser diagram to indicate smoke venting fans and motorized dampers and HVAC/exhaust fan shutdown
Detailed wiring diagrams for fan shut-offs, exhaust fan operation, pressurization fan operation, damper operation (opening,
closing, throttling)
Sequence of operation of smoke venting system in a narrative form
Describe operation under normal mode
Describe operation under fire alarm mode
Indicate fire alarm initiating devices that activate changes of operation/sequence
Routing methods for protection of emergency conductors
Electromagnetic Locks and Hold-Open Devices
Coordinate design with the architect
Sequence of operation in both normal and fire alarm mode
Wiring diagrams for connection of devices
Locations of devices on the floor plans
•Elevators
Sequence of operation in a narrative form
Wiring diagram details
Routing and method of protection of emergency conductors
• Fire stop systems for electrical penetrations of fire separations
• Coordinate electrical equipment location and functional requirements with other RPRs/CRP.
Construction Phase
Provide field reviews of electrical components.
Review shop drawings for electrical components and coordinate requirements with other RPRs.
Review shop drawings for other disciplines which may influence electrical components.
Occupancy Phase
Ascertain that the electrical components substantially conform to the electrical drawings and supporting documents.
Perform an active role in witnessing the functional testing of the electrical components of the fire and life safety systems.
Review the electrical-related Occupancy Permit submission documents provided by the Contractor and subtrades for completeness
and accuracy.
Prepare and forward to the CRP the electrical Schedule C-B and other assurance letters and documents required for the
Occupancy Permit.
Division C: Administrative Provisions Notes to Part 2 – Administrative Provisions
British Columbia Building Code 2018 Division C
4.0. Sample Occupancy Demonstration/Witnessing Flowchart
DEVELOP TESTING PROTOCOL/PROCEDURE (Design Stage)
CRP/RPRs develop Testing Demonstration/Witness Protocol
— Issue to Authorities Having Jurisdiction & Contractor
||
\/
DOCUMENTATION SUBMISSION
Contractor/Subtrades submit/deliver all appropriate documentation to CRP/RPRs, including:
— The original Contractor’s Materials and Test Certificate for the sprinkler system
— Fire Pump Flow Test Certificate(s)
— Back Flow Prevention Certificate(s)
— Emergency generator commissioning and verification reports
— The original Certificate of Verification for the fire alarm system
— Appendix “A” to the fire alarm verification report
— ULC Certificate for Protective Signaling Service
— Other documentation, as appropriate
||
\/
CONTRACTOR DEMONSTRATION — CONSTRUCTION COMPLETE
Contractor & Subtrades
(Mechanical, Electrical, Elevator, Sprinkler, Fire Alarm, etc.) as appropriate
||
\/
COORDINATED FINAL CONSULTANT REVIEW DEMONSTRATION/WITNESSING CRP/RPRs
(Architect, Mechanical Engineer, Electrical Engineer, Sprinkler Engineer, Equivalency Consultant, etc.) as appropriate
||
\/
OCCUPANCY SUBMISSION DOCUMENTS
CRP to collect all submission documents, including Schedule Cs from RPRs, and submit to AHJ in a complete package
||
\/
COORDINATED FINAL AHJ REVIEW DEMONSTRATION/WITNESSING
Contractor, Subtrades, CRP/RPRs demonstrate to AHJ
(Building, Fire, Mechanical, Electrical and Sprinkler)
||
\/
OP ISSUED
A-2.2.8.1.(1) Use of Terms “Building” and “House”. Although the word “house” is used in the terms “proposed house,”
“reference house” and “house performance compliance calculation report” in Subsection2.2.8., it is intended to include other types of
residential buildings also addressed by Subsection9.36.5. of DivisionB. The terms “proposed building,” “reference building” and
“building performance compliance calculation report” used in the NECB apply to other types of buildings.
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
A-2.2.8.3.(2)(c)(i) Annual Energy Consumption. The performance compliance calculation method detailed in
Subsection9.36.5. of Division B uses a number of assumptions regarding environmental values and operating conditions in order to
standardize the calculations and neutralize the impact of occupant behaviour or to exclude issues that are not addressed in the
requirements. Note that the result of the energy model calculations is not a prediction of the actual energy consumption of the
proposed house.
A-2.3.1. Alternative Solutions. Beyond the purposes of demonstrating compliance and acquiring a building permit, there are
other important reasons for requiring that the proponent of an alternative solution submit project documentation (i.e. a compliance
report) to the authority having jurisdiction and for the authority having jurisdiction to retain that documentation for a substantial
period following the construction of a building:
Alternative solutions made possible by objective-based codes may have special maintenance requirements, which would be
described in the documentation.
Documentation helps consultants perform code compliance assessments of existing buildings before they are sold and informs
current owners or prospective buyers of existing buildings of any limitations pertaining to their future use or development.
Documentation provides design professionals with the basic information necessary to design changes to an existing building.
An alternative solution could be invalidated by a proposed alteration to a building. Designers and regulators must therefore know
the details of the particular alternative solutions that were integral to the original design. Complete documentation should provide
insight as to why one alternative solution was chosen over another.
Documentation is the “paper trail” of the alternative solution negotiated between the designer and the regulator and should
demonstrate that a rational process led to the acceptance of the alternative solution as an equivalency.
It is possible that over time a particular alternative solution may be shown to be inadequate. It would be advantageous for a
jurisdiction to know which buildings included that alternative solution as part of their design: documentation will facilitate this
type of analysis.
Project documentation provides important information to a forensic team that is called to investigate an accident or why a design
failed to provide the level of performance expected.
This subject is discussed in further detail in “Recommended Documentation Requirements for Projects Using Alternative Solutions in
the Context of Objective-Based Codes,” which was prepared for the CCBFC Task Group on Implementation of Objective-Based
Codes and is available on NRC’s Web site.
Notes to Part 2 – Administrative Provisions Division C: Administrative Provisions
Division C British Columbia Building Code 2018
A-2.2.8.3.(2)(c)(i) Annual Energy Consumption. The performance compliance calculation method detailed in
Subsection9.36.5. of Division B uses a number of assumptions regarding environmental values and operating conditions in order to
standardize the calculations and neutralize the impact of occupant behaviour or to exclude issues that are not addressed in the
requirements. Note that the result of the energy model calculations is not a prediction of the actual energy consumption of the
proposed house.
A-2.3.1. Alternative Solutions. Beyond the purposes of demonstrating compliance and acquiring a building permit, there are
other important reasons for requiring that the proponent of an alternative solution submit project documentation (i.e. a compliance
report) to the authority having jurisdiction and for the authority having jurisdiction to retain that documentation for a substantial
period following the construction of a building:
Alternative solutions made possible by objective-based codes may have special maintenance requirements, which would be
described in the documentation.
Documentation helps consultants perform code compliance assessments of existing buildings before they are sold and informs
current owners or prospective buyers of existing buildings of any limitations pertaining to their future use or development.
Documentation provides design professionals with the basic information necessary to design changes to an existing building.
An alternative solution could be invalidated by a proposed alteration to a building. Designers and regulators must therefore know
the details of the particular alternative solutions that were integral to the original design. Complete documentation should provide
insight as to why one alternative solution was chosen over another.
Documentation is the “paper trail” of the alternative solution negotiated between the designer and the regulator and should
demonstrate that a rational process led to the acceptance of the alternative solution as an equivalency.
It is possible that over time a particular alternative solution may be shown to be inadequate. It would be advantageous for a
jurisdiction to know which buildings included that alternative solution as part of their design: documentation will facilitate this
type of analysis.
Project documentation provides important information to a forensic team that is called to investigate an accident or why a design
failed to provide the level of performance expected.
This subject is discussed in further detail in “Recommended Documentation Requirements for Projects Using Alternative Solutions in
the Context of Objective-Based Codes,” which was prepared for the CCBFC Task Group on Implementation of Objective-Based
Codes and is available on NRC’s Web site.