8.4.2.2. Maximum Sewage Flow
(1) A Class 2 sewage system shall not be constructed where the daily design greywaterflow to the system exceeds 1 000 L/day.
This material is COPYRIGHT © QUEEN'S PRINTER FOR ONTARIO, 2008-2018
This site is not an offical copy or maintitned by the Government of Ontario.
Buildingcode.Online