The Ontario Building Code | Air Tests

7.3.6.5. Air Tests

(1) Where an air test is made, it shall be conducted in accordance with the manufacturer’s instructions for the piping materials, and,

(a) air shall be forced into the system until a gauge pressure of 35 kPa is created, and

(b) this pressure shall be maintained for at least 15 min without a drop in pressure.